Roof Top SOLAR System- A process
Choose your solar panel service provider
Based on elements such as skillfulness, durability, product warranty, price and temperature coefficient,
Accessories
Services
Repair
Contact
Site Assessment:
The first step in the solar panel installation process is to assess the site where the system will be installed. This includes determining the amount of sunlight the site receives, the orientation and tilt of the roof or ground, the shading of the area, and any potential obstacles that may affect the system’s performance.
Design:
After the site assessment, the next step is to design the solar panel system. This involves selecting the appropriate solar panels, inverters, and other components based on the energy needs of the site and the available space for the installation.
Procurement:
With the design and permits in place, the next step is to procure the solar panels and other necessary components. It is important to work with reputable suppliers to ensure the quality and reliability of the equipment.
Installation:
The actual installation of the solar panel system can begin once all the necessary components have been procured. The installation process typically involves the following steps:
1 Mounting:
The solar panels are mounted on the roof or on the ground using racking systems.
2 Wiring:
The solar panels are connected to each other and to the inverter using wiring.
3 Inverter Installation:
The inverter is installed near the main electrical panel and connected to the solar panels.
4 Connection to the Grid:
After the solar panel system is installed, it must be connected to the grid. This involves obtaining permission from the utility company and installing a bi-directional meter.
5 Testing and Commissioning:
Once the solar panel system is installed and connected to the grid, it must be tested and commissioned to ensure that it is functioning properly. This involves verifying the electrical connections, testing the system’s performance, and ensuring that it is compliant with all relevant regulations.
6 Maintenance and Monitoring:
Finally, the solar panel system must be properly maintained and monitored to ensure optimal performance and longevity. This includes regular cleaning and inspection of the panels, monitoring of energy production, and addressing any issues that may arise.
By following these steps, AASA Technologies can successfully install a solar panel system to help reduce their energy costs and environmental impact
Town And Urban Areas in Maharashtra, M.P.
Solar panels, are made to last more than 25 years.
![Energy Renewable Photovoltaic Solar Electricity](https://www.aasatech.co.in/wp-content/uploads/2022/10/Solar-Rooftop-System.-6.jpg)
![solar -panel (13)](https://www.aasatech.co.in/wp-content/uploads/2022/10/solar-panel-13.jpg)
About Solar Products
![SOLAR IMAGE4](https://www.aasatech.co.in/wp-content/uploads/2022/07/SOLAR-IMAGE4.jpg)
Contact Us
India
info@aasatech.co.in
Ajit Vaidya
+91 96198 96558
Working Hours
Monday: 9am–4pm
Tuesday: 9am–4pm
Wednesday: 9am–4pm
Thursday: 9am–4pm
Friday: 8am–2pm
Weekends: Closed